desk-story-ledger
ProductivityMaintains a publication's story paperwork in plain markdown: a pitch log for ideas awaiting decisions, one record per approved story, a shared status vocabulary, backward-planned deadline countdowns with slip alerts, reporter-editor handoff notes, pre- and post-publish checklists, a desk calendar with an evergreen shelf, editorial meeting agendas, written process guides that name each tool and where its template lives, and onboarding checklists for new staff. Use when the user wants to set up or keep up story tracking, log pitches before approval, plan deadlines backward from a publish slot, prepare an editorial meeting, respond to a deadline at risk, write down a newsroom process, or structure a new hire's first month. Not for reporting, writing, or editing the stories themselves, not for CMS configuration, distribution, analytics, or legal work, and not for any action on a live publishing system.
- Version
- v1.0.0
- Size
- 19 KB
- Updated
- 2026-10-11
$ skilvault read --manual desk-story-ledgerYour client verifies the signature before reading. This explicit manual read is available on every plan. Free automatically loads five chosen skills; paid plans automatically load relevant skills across the library.